Pre Engineered Buildings are extremely quick and efficient buildings which replaced traditional building which were made with concrete and asbestos which require more time, money and labor. They have a simple design, are light weight & easy to construct. Delivery takes an average of 6 to 8 weeks. Thus, both costs & time of erection are minimized. The erection process is easy, fast, step by step and easy to fabricate.Outstanding architectural design can be achieved at low cost. PEBs are flexible and modular and lend themselves easily to future expansion. Pre engineered building consists of following components:
· Structural Systems · Secondary Systems · Cladding STRUCTURAL SYSTEMS :Structural systems are the main load carrying and support members of a pre- engineered building. SECONDARY MEMBERS: Secondary members are load carrying members suitable to ensure the stability of the building against forces in any direction. They primarily include purlins and girts, eave strut, cable bracing and open steel web joists. CLADDING: The steel substrate is hot dipped galvanized zinc or hot dipped zinc / aluminum coated. The surface of the metal coatings is then given a series of pre treatments to ensure that they are completely clean.
6 Comments
|
Archives
April 2023
Categories
All
|